- Opening bid
- $800,000
- Ends
- Thu, Oct 29, 5:00 PM ET
11d left
- Location
- El Paso, TX
- Seller
- DHS, Customs and Border Protection
- Bidders
- 0
Reserve: Reserve present, not met
Bid data fetched Sat, Oct 17, 1:14 PM ET
· re-verified live Oct 27. Bids move fast; the listing is the source of truth.
As captured: · Thu Oct 29, 2026 5:00 PM ET (listed 4:00 PM CT)
Wild Lots doesn't sell this item and isn't affiliated with GSA Auctions or the selling agency. Check the listing terms, fees, inspection, and removal rules at the source before you bid.
Listing description (show)
For inspections and removal by appointment ONLY, no exceptions, by contacting the following individuals: The Primary POC for this aircraft is Mr. Luis Vargas at 575-779-0955 , LUIS.F.VARGAS@cbp.dhs.gov ; The alternate POC for this aircraft is Mr. Scott H. Widick at 520-306-6350 , scott.widick@cbp.dhs.gov Sikorsky UH-60A Blackhawk, SN: 82-23747. This aircraft comes with the following: 4-each Main Rotor Blades (MRB) 2-each Tail Rotor Blades (TRB) 2-each Engines Please read the entire description carefully. Records are provided for informational purposes only. The accuracy and availability of records is NOT guaranteed or warranted. SOLD AS IS. All sales are final and no warranty is implied or applied. ***WARNING: There are parts removed from this aircraft including but not limited to, see the attached, Excel Spreadsheet for more information by clicking on " Documents Section" THE CONDITION OF THE PROPERTY IS "AS IS" CONDITION. BIDDERS HAVE THE OPPORTUNITY TO CONDUCT PHYSICAL INSPECTION AND PHYSICAL INSPECTION IS STRONGLY RECOMMENDED PRIOR TO BIDDING. IN WAIVING THEIR INSPECTION RIGHTS, BIDDERS BEAR THE RISK FOR ANY GROSS OMISSIONS REGARDING THE FUNCTIONALITY OF ITEMS, FAILURE TO CITE MAJOR MISSING PARTS, AND/OR RESTRICTIONS WITH REGARDS TO USAGE THAT WOULD HAVE BEEN REVEALED BY PHYSICAL INSPECTION. Aircraft may not be in compliance with applicable FAA requirements. Buyer is responsible for completing the End Use Certificate and bringing the aircraft into compliance with 14 CFR Chapter or other applicable standards, by obtaining all necessary FAA inspections or modifications. The removal time frame will be extended so that the End Use Certificate DLA form can be completed by the winning bidder and must be approved by the Department of Defense before the aircraft shall be released to the winning bidder. The End Use Certificate form is located on the "Documents" Section. ****WARNING TO BIDDERS: The current EUC assessment timeframe is roughly 30-90 days, but could move in either direction. Payment is due within five (5) business days after the End Use Certificate receives approval, regardless of the number or timing of approvals. Successful receiving parties are cautioned that they will be responsible for coordination and any expenses incurred with personnel, clearances, inspection, maintenance, loading, packing, movement and removal of the aircraft from the exact place on the property. All maintenance actions performed after the official transfer of ownership and any maintenance associated with the movement of the aircraft will be coordinated between the receiving party. The Government shall not be liable for personal injuries to, disabilities of, or death of any persons arising from or incidental to the inspection, purchase, removal, use or disposition of this aircraft. The successful bidder shall hold the Government harmless from any or all debts, liabilities, judgments, costs, demands, suits, actions, or claims of any nature arising from or …